-
Case Studies 04/17/2022
Engineering manager avoids costly hassle of breaking concrete in basement remode
Brady Main successfully adds half bath and full bar to his basement by installing Saniflo’s Saniaccess 2 — making the remodeling experience simple and cost-effective.
Read more -
Case Studies 04/06/2022
Historic, Topsail Island motor inn uses efficient, cost-saving solution to address plumbing issues after extensive renovation
Capp Plumbing successfully uses Sanibest Pro to resolve aging, problematic cast iron drainage lines, providing substantial cost-savings to hotel with minimal downtime.
Read more -
Case Studies 02/03/2022
Mechanical contractor opts for cost-saving Saniflo above-floor plumbing when converting his own garage into an in-law suite
When Joseph Cariola turned his garage into living quarters for guests, professional experience led him to install Saniflo’s Saniaccess 2 — a cost-effective solution that would be simple to install and capable of handling the varied usage of multiple visitors.
Read more -
Case Studies 01/25/2022
Custom trailer manufacturer chooses Saniflo above-floor grinding and shower solution for ADA-compliant public restroom and shower trailers
Montondo Trailer installs reliable Sanibest Pro, Sanigrind Pro, and Sanishower in their drop trailers to accommodate long term and heavy usage by the general public.
Read more -
Case Studies 12/10/2021
Humanitarian organization Showering Love expands offering of restrooms & showers
Equipped with three donated Saniflo Sanishower drain pumps and one Sanibest Pro grinder pump, the newly refurbished Showering Love bus, Faith, becomes the nonprofit’s second vehicle to provide those i
Read more